Wednesday, December 3, 2014

Construction Terms

Construction Terms- Y

Y- A “Y” shaped plumbing fitting.
Yard of concrete- One cubic yard of concrete is 3′ X 3′ X 3′ in volume, or 27 cubic feet.  One cubic yard of concrete will pour 80 square feet of 3 ½” sidewalk or basement/garage floor.
Yoke- The location where a home’s water meter is sometimes installed between two copper pipes, and located in the water meter pit in the yard.
                                   Construction Terms- Z
Z-bar flashing- Bent, galvanized metal flashing that’s installed above a horizontal trim board of an exterior window, door, or brick run. It prevents water from getting behind the trim/brick and into the home.
Zone- The section of a building that is served by one heating or cooling loop because it has noticeably distinct heating or cooling needs. Also, the section of property that will be watered from a lawn sprinkler system.
Zone valve- A device, usually placed near the heater or cooler, which controls the flow of water or steam to parts of the building; it is controlled by a zone thermostat.
Zoning- A governmental process and specification which limits the use of a property e.g. single family use, high rise residential use, industrial use, etc. Zoning laws may limit where you can locate a structure. Also see building codes.

Tuesday, December 2, 2014

Construction Terms

Construction Terms- W
Wafer board - A manufactured wood panel made out of 1″- 2″ wood chips and glue. Often used as a substitute for plywood in the exterior wall and roof sheathing.
Walk-Through- A final inspection of a home before “Closing” to look for and document problems that need to be corrected.
Wall out- When a painter pray paints the interior of a home.
Warping- Any distortion in a material.
Warranty- In construction there are two general types of warranties. One is provided by the manufacturer of a product such as roofing material or an appliance. The second is a warranty for the labour. For example, a roofing contract may include a 20 year material warranty and a 5 year labour warranty. Many new home builders provide a one year warranty. Any major issue found during the first year should be communicated to the builder immediately. Small items can be saved up and presented to the builder for correction periodically through the first year after closing.
Waste pipe and vent- Plumbing plastic pipe that carries waste water to the municipal sewage system.
Water board- Water resistant drywall to be used in tub and shower locations. Normally green or blue coloured
Water closet- Another name for toilet.
Water meter pit (or vault)- The box /cast iron bonnet and concrete rings that contains the water meter.
Water-repellent preservative- A liquid applied to wood to give the wood water repellent properties
Water table- The location of the underground water, and the vertical distance from the surface of the earth to this underground water.
Water tap- The connection point where the home water line connects to the main municipal water system.
W C- An abbreviation for water closet (toilet).
Weatherization- Work on a building exterior in order to reduce energy consumption for heating or cooling.  Work involving adding insulation, installing storm windows and doors, caulking cracks and putting on weather-stripping.
Weather strip- Narrow sections of thin metal or other material installed to prevent the infiltration of air and moisture around windows and doors.
Weep holes- Small holes in storm window frames that allow moisture to escape.
Whole house fan- A fan designed to move air through and out of a home and normally installed in the ceiling.
Wind bracing- Metal straps or wood blocks installed diagonally on the inside of a wall from bottom to top plate, to prevent the wall from twisting, racking, or falling over “domino” fashion.
Window buck- Square or rectangular box that is installed within a concrete foundation or block wall. A window will eventually be installed in this “buck” during the siding stage of construction
Window frame- The stationary part of a window unit; window sash fits into the window frame.
Window sash- The operating or movable part of a window; the sash is made of window panes and their  border.
Wire nut- A plastic device used to connect bare wires together.
Wonder board ™- A panel made out of concrete and fibre glass usually used as a ceramic tile backing material. Commonly used on bathtub decks.
Wrapped drywall- Areas that get complete drywall covering, as in the doorway openings of bifold and bi pass closet doors.

Saturday, November 29, 2014

Construction Terms

Construction Terms- U

UL (Underwriters’ Laboratories)- An independent testing agency that checks electrical devices and other components for possible safety hazards.
Undercoat- A coating applied prior to the finishing or top coats of a paint job. It may be the first of two or the second of three coats. Sometimes called the Prime coat.
Underground plumbing- The plumbing drain and waste lines that are installed beneath a basement floor.
Underlayment- A ¼” material placed over the subfloor plywood sheeting and under finish coverings, such as vinyl flooring, to provide a smooth, even surface. Also a secondary roofing layer that is waterproof or water-resistant, installed on the roof deck and beneath shingles or other roof-finishing layer.
Union- A plumbing fitting that joins pipes end-to-end so they can be dismantled.
Utility easement- The area of the earth that has electric, gas, or telephone lines. These areas may be owned by the homeowner, but the utility company has the legal right to enter the area as necessary to repair or service the lines.
                                  Construction Terms- V
Valley- The “V” shaped area of a roof where two sloping roofs meet. Water drains off the roof at the valleys.
Valley flashing- Sheet metal that lays in the “V” area of a roof valley.
Valuation- An inspection carried out for the benefit of the mortgage lender to ascertain if a property is a good security for a loan.
Valuation fee- Th fee paid by the prospective borrower for the lender’s inspection of the property. Normally paid upon loan application.
Vapor barrier- A building product installed on exterior walls and ceilings under the drywall and on the warm side of the insulation. It is used to retard the movement of water vapor into walls and prevent condensation within them. Normally, polyethylene plastic sheeting is used.
Variable rate- An interest rate that will vary over the term of the loan.
Veneer- Extremely thin sheets of wood. Also a thin slice of wood or brick or stone covering a framed wall.
Vent- A pipe or duct which allows the flow of air and gasses to the outside. Also, another word for the moving glass part of a window sash, i.e. window vent.
Vermiculite- A mineral used as bulk insulation and also as aggregate in insulating and acoustical plaster and in insulating concrete floors.
Veterans Administration (VA)- A federal agency that insures mortgage loans with very liberal down payment requirements for honorably discharged veterans and their surviving spouses.
Visqueen- A 4 mil or 6 mil plastic sheeting.
Void- Cardboard rectangular boxes that are installed between the earth (between caissons) and the concrete foundation wall. Used when expansive soils are present.
Voltage- A measure of electrical potential. Most homes are wired with 110 and 220 volt lines. The 110 volt power is used for lighting and most of the other circuits. The 220 volt power is usually used for the kitchen range, hot water heater and dryer.

Monday, November 24, 2014

Construction Terms

                                 Construction Terms- T
T & G, tongue and groove- A joint made by a tongue (a rib on one edge of a board) that fits into a corresponding groove in the edge of another board to make a tight flush joint. Typically, the subfloor plywood is T & G.
Tab – The exposed portion of strip shingles defined by cutouts.
Tail beam- A relatively short beam or joist supported in a wall on one end and by a header at the other.
Take off- The material necessary to complete a job.
Taping- The process of covering drywall joints with paper tape and joint compound.
T bar- Ribbed, “T” shaped bars with a flat metal plate at the bottom that are driven into the earth. Normally used chain link fence poles, and to mark locations of a water meter pit.
Teco- Metal straps that are nailed and secure the roof rafters and trusses to the top horizontal wall plate. Sometimes called a hurricane clip.
Tee- A “T” shaped plumbing fitting.
Tempered- Strengthened. Tempered glass will not shatter nor create shards, but will “pelletize” like an automobile window. Required in tub and shower enclosures and locations, entry door glass and sidelight glass, and in a windows when the window sill is less than 16″ to the floor.
Termites- Wood eating insects that superficially resemble ants in size and general appearance, and live in colonies.
Termite shield- A shield, usually of galvanized metal, placed in or on a foundation wall or around pipes to prevent the passage of termites.
Terra cotta- A ceramic material molded into masonry units.
Thermoply ™- Exterior laminated sheathing nailed to the exterior side of the exterior walls. Normally ¼ ” thick, 4 X 8 or 4 x 10 sheets with an aluminumized surface.
Thermostat- A device which relegates the temperature of a room or building by switching heating or cooling equipment on or off.
Three-dimensional shingles- Laminated shingles. Shingles that have added dimensionality because of extra layers or tabs, giving a shake-like appearance. May also be called “architectural shingles”.
Threshold- The bottom metal or wood plate of an exterior door frame. Generally they are adjustable to keep a tight fit with the door slab.
Time and materials contract- A construction contract which specifies a price for different elements of the work such as cost per hour of labor, overhead, profit, etc. A contract which may not have a maximum price, or may state a ‘price not to exceed’.
Tinner- Another name for the heating contractor.
Tip up- The downspout extension that directs water (from the home’s gutter system) away from the home. They typically swing up when mowing the lawn, etc.
Title- Evidence (usually in the form of a certificate or deed) of a person’s legal right to ownership of a property.
TJI or TJ- Manufactured structural building component resembling the letter “I“. Used as floor joists and rafters. I-joists include two key parts: flanges and webs. The flange or from of the I joist may be made of laminated veneer lumber or dimensional lumber, usually formed into a 1 ½” width. The web or center of the I-joist is commonly made of plywood or oriented strand board (OSB). Large holes can be cut in the web to accommodate duct work and plumbing waste lines. I-joists are available in lengths up to 60” long.
Toenailing- To drive a nail in at a slant. Method used to secure floor joists to the plate.
Top chord- The upper or top member of a truss.
Top plate- Top horizontal member of a frame wall supporting ceiling joists, rafters, or other members.
Transmitter (garage door)- The small, push button device that causes the garage door to open or close.
Trap- A plumbing fitting that holds water to prevent air, gas, and vermin from backing up into a fixture.
Tread- The walking surface board in a stairway on which the foot is placed.
Treated lumber- A wood product which has been impregnated with chemical pesticides such as CCA (Chromated Copper Arsenate) to reduce damage from wood rot or insects. Often used for the portions of a structure which are likely to be in contact with soil and water. Wood may also be treated with a fire retardant.
Trim (plumbing, heating, electrical)- The work that the “mechanical” contractors perform to finish their respective aspects of work, and when the home is nearing completion and occupancy.
Trim- Interior- The finish materials in a building, such as moldings applied around openings (window trim, door trim) or at the floor and ceiling of rooms (baseboard, cornice, and other moldings). Also, the physical work of installing interior doors and interior woodwork, to include all handrails, guardrails, stair way balustrades, mantles, light boxes, base, door casings, cabinets, countertops, shelves, window sills and aprons, etc. Exterior- The finish materials on the exterior a building, such as moldings applied around openings (window trim, door trim), siding, windows, exterior doors, attic vents, crawl space vents, shutters, etc. Also, the physical work of installing these materials
Trimmer- The vertical stud that supports a header at a door, window, or other opening.
Truss- An engineered and manufactured roof support member with “zig-zag” framing members. Does the same job as a rafter but is designed to have a longer span than a rafter.
Tub trap- Curved, “U” shaped section of a bath tub drain pipe that holds a water seal to prevent sewer gasses from entering the home through tubs water drain.
Turnkey- A term used when the subcontractor provides all materials (and labor) for a job.
Turpentine- A petroleum, volatile oil used as a thinner in paints and as a solvent in varnishes

Wednesday, November 19, 2014

CLEAR COVER TO MAIN REINFORCEMENT:

  • FOOTINGS : 75 mm
  • RAFT FOUNDATION.TOP : 50 mm
  • RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
  • STRAP BEAM : 50 mm
  • GRADE SLAB : 20 mm
  • COLUMN : 40 mm
  • SHEAR WALL : 25 mm
  • BEAMS : 25 mm
  • SLABS : 15 mm
  • FLAT SLAB : 20 mm
  • STAIRCASE : 15 mm
  • RETAINING WALL : 20/ 25 mm on earth
  • WATER RETAINING STRUCTURES : 20/30 mm

Saturday, November 15, 2014

Construction Terms

                   Construction Terms- S

Saddle- A small second roof built behind the back side of a fireplace chimney to divert water around the chimney. Also, the plate at the bottom of some—usually exterior—door openings. Sometimes called a threshold.
Sack mix- The amount of Portland cement in a cubic yard of concrete mix. Generally, 5 or 6 sack is required in a foundation wall.
Sales contract - A contract between a buyer and seller which should explain: (1) What the purchase includes, (2) What guarantees there are, (3) When the buyer can move in, (4) What the closing costs are, and (5) What recourse the parties have if the contract is not fulfilled or if the buyer cannot get a mortgage commitment at the agreed upon time.
Sand float finish- Lime that is mixed with sand, resulting in a textured finish on a wall.
Sanitary sewer- A sewer system designed for the collection of waste water from the bathroom, kitchen and laundry drains, and is usually not designed to handle storm water.
Sash- A single light frame containing one or more lights of glass. The frame that holds the glass in a window, often the movable part of the window.
Sash balance- A device, usually operated by a spring and designed to hold a single hung window vent up and in place
Saturated felt- A felt which is impregnated with tar or asphalt.
Schedule (window, door, mirror)- A table on the blueprints that list the sizes, quantities and locations of the windows, doors and mirrors.
Scrap out- The removal of all drywall material and debris after the home is “hung out” (installed) with drywall.
Scratch coat- The first coat of plaster, which is scratched to form a bond for a second coat.
Screed, concrete- To level off concrete to the correct elevation during a concrete pour.
Screed, plaster- A small strip of wood, usually the thickness of the plaster coat, used as a guide for plastering.
Scribing- Cutting and fitting woodwork to an irregular surface.
Scupper- (1) An opening for drainage in a wall, curb or parapet. (2) The drain in a down spout or flat roof, usually connected to the down spout.
Sealer- A finishing material, either clear or pigmented, that is usually applied directly over raw wood for the purpose of sealing the wood surface.
Seasoning- Drying and removing moisture from green wood in order to improve its usability.
Self-sealing shingles- Shingles containing factory-applied strips or spots of self-sealing adhesive.
Semigloss paint or enamel- A paint or enamel made so that its coating, when dry, has some luster but is not very glossy. Bathrooms and kitchens are normally painted semi-gloss
Septic system- An on site waste water treatment system. It usually has a septic tank which promotes the biological digestion of the waste, and a drain field which is designed to let the left over liquid soak into the ground. Septic systems and permits are usually sized by the number of bedrooms in a house.
Service entrance panel- Main power cabinet where electricity enters a home wiring system.
Service equipment- Main control gear at the service entrance, such as circuit breakers, switches, and fuses.
Service lateral- Underground power supply line.
Setback Thermostat- A thermostat with a clock which can be programmed to come on or go off at various temperatures and at different times of the day/week. Usually used as the heating or cooling system thermostat.
Settlement- Shifts in a structure, usually caused by freeze-thaw cycles underground.
Sewage ejector- A pump used to ‘lift’ waste water to a gravity sanitary sewer line. Usually used in basements and other locations which are situated bellow the level of the side sewer.
Sewer lateral- The portion of the sanitary sewer which connects the interior waste water lines to the main sewer lines. The side sewer is usually buried in several feet of soil and runs from the house to the sewer line. It is usually ‘owned’ by the sewer utility, must be maintained by the owner and may only be serviced by utility approved contractors. Sometimes called side sewer.
Sewer stub- The junction at the municipal sewer system where the home’s sewer line is connected.
Sewer tap- The physical connection point where the home’s sewer line connects to the main municipal sewer line.
Shake- A wood roofing material, normally cedar or redwood. Produced by splitting a block of the wood along the grain line. Modern shakes are sometimes machine sawn on one side. See shingle.
Shear block- Plywood that is face nailed to short (2 X 4′s or 2 X 6′s) wall studs (above a door or window, for example). This is done to prevent the wall from sliding and collapsing.
Sheathing, sheeting- The structural wood panel covering, usually OSB or plywood, used over studs, floor joists or rafters/trusses of a structure.
Shed roof- A roof containing only one sloping plane.
Sheet metal work- All components of a house employing sheet metal, such as flashing, gutters, and down spouts.
Sheet metal duct work- The heating system. Usually round or rectangular metal pipes and sheet metal (for Return Air) and installed for distributing warm (or cold) air from the furnace to rooms in the home.
Sheet rock- Drywall-Wall board or gypsum- A manufactured panel made out of gypsum plaster and encased in a thin cardboard. Usually 1/2″ thick and 4′ x 8′ or 4′ x 12′ in size. The ‘joint compound’. ‘Green board’ type drywall has a greater resistance to moisture than regular (white) plasterboard and is used in bathrooms and other “wet areas”.
Shim- A small piece of scrap lumber or shingle, usually wedge shaped, which when forced behind a furring strip or framing member forces it into position. Also used when installing doors and placed between the door jamb legs and 2 X 4 door trimmers. Metal shims are wafer  1 1/2″ X 2″ sheet metal of various thickness’ used to fill gaps in wood framing members, especially at bearing point locations.
Shingles- Roof covering of asphalt. asbestos, wood, tile, slate, or other material cut to stock lengths, widths, and thickness’.
Shingles, siding- Various kinds of shingles, used over sheathing for exterior wall covering of a structure.
Short circuit- A situation that occurs when hot and neutral wires come in contact with each other. Fuses and circuit breakers protect against fire that could result from a short.
Shutter- Usually lightweight louvred decorative frames in the form of doors located on the sides of a window. Some shutters are made to close over the window for protection.
Side sewer- The portion of the sanitary sewer which connects the interior waste water lines to the main sewer lines. The side sewer is usually buried in several feet of soil and runs from the house to the sewer line. It is usually ‘owned’ by the sewer utility, must be maintained by the owner and may only be serviced by utility approved contractors. Sometimes called sewer lateral.
Siding- The finished exterior covering of the outside walls of a frame building.
Siding, (lap siding)- Slightly wedge-shaped boards used as horizontal siding in a lapped pattern over the exterior sheathing. Varies in butt thickness from ½ to ¾ inch and in widths up to 12″.
Sill- (1) The 2 X 4 or 2 X 6 wood plate framing member that lays flat against and bolted to the foundation wall (with anchor bolts) and upon which the floor joists are installed. Normally the sill plate is treated lumber. (2) The member forming the lower side of an opening, as a door sill or window sill.
Sill cock- An exterior water faucet (hose bib).
Sill plate (mudsill)- Bottom horizontal member of an exterior wall frame which rests on top a foundation, sometimes called mud sill. Also sole plate, bottom member of an interior wall frame.
Sill seal- Fiber glass or foam insulation installed between the foundation wall and sill (wood) plate. Designed to seal any cracks or gaps.
Single hung window- A window with one vertically sliding sash or window vent.
Skylight- A more or less horizontal window located on the roof of a building.
Slab, concrete- Concrete pavement, i.e. driveways, garages, and basement floors.
Slab, door- A rectangular door without hinges or frame.
Slab on grade- A type of foundation with a concrete floor which is placed directly on the soil. The edge of the slab is usually thicker and acts as the footing for the walls.
Slag- Concrete cement that sometimes covers the vertical face of the foundation void material.
Sleeper- Usually, a wood member embedded in concrete, as in a floor, that serves to support and to fasten the sub floor or flooring.
Sleeve(s)- Pipe installed under the concrete driveway or side walk, and that will be used later to run sprinkler pipe or low voltage wire.
Slope- The incline angle of a roof surface, given as a ratio of the rise (in inches) to the run (in feet). See also pitch.
Slump- The “wetness” of concrete. A 3 inch slump is dryer and stiffer than a 5 inch slump.
Soffit- The area below the eaves and overhangs. The underside where the roof overhangs the walls. Usually the underside of an overhanging cornice.
Soil pipe- A large pipe that carries liquid and solid wastes to a sewer or septic tank.
Soil stack- A plumbing vent pipe that penetrates the roof.
Sole plate- The bottom, horizontal framing member of a wall that’s attached to the floor sheeting and vertical wall studs.
Solid bridging- A solid member placed between adjacent floor joists near the center of the span to prevent joists or rafters from twisting.
Sonotube- Round, large cardboard tubes designed to hold wet concrete in place until it hardens.
Sound attenuation- Sound proofing a wall or subfloor, generally with fiber glass insulation.
Space heat- Heat supplied to the living space, for example, to a room or the living area of a building.
Spacing- The distance between individual members or shingles in building construction.
Span- The clear distance that a framing member carries a load without support between structural supports. The horizontal distance from eaves to eaves.
Spec home- A house built before it is sold. The builder speculates that he can sell it at a profit.
Specifications or Specs- A narrative list of materials, methods, model numbers, colors, allowances, and other details which supplement the information contained in the blue prints. Written elaboration in specific detail about construction materials and methods. Written to supplement working drawings.
Splash block- Portable concrete (or vinyl) channel generally placed beneath an exterior sill cock (water faucet) or down spout in order to receive roof drainage from down spouts and to divert it away from the building.
Square- A unit of measure-100 square feet-usually applied to roofing and siding material. Also, a situation that exists when two elements are at right angles to each other. Also a tool for checking this.
Square-tab shingles- Shingles on which tabs are all the same size and exposure.
Squeegie- Fine pea gravel used to grade a floor (normally before concrete is placed).
Stack (trusses)- To position trusses on the walls in their correct location.
Standard practices of the trade(s)- One of the more common basic and minimum construction standards. This is another way of saying that the work should be done in the way it is normally done by the average professional in the field.
Starter strip- Asphalt roofing applied at the eaves that provides protection by filling in the spaces under the cut outs and joints of the first course of shingles.
Stair carriage or stringer- Supporting member for stair treads. Usually a 2 X 12 inch plank notched to receive the treads; sometimes called a “rough horse.”
Stair landing- A platform between flights of stairs or at the termination of a flight of stairs. Often used when stairs change direction. Normally no less than 3 ft. X 3 ft. square.
Stair rise- The vertical distance from stair tread to stair tread (and not to exceed 7 ½”).
Static vent- A vent that does not include a fan.
STC (Sound Transmission Class)- The measure of sound stopping of ordinary noise.
Steel inspection- A municipal and/or engineers inspection of the concrete foundation wall, conducted before concrete is poured into the foundation panels. Done to insure that the rebar (reinforcing bar), rebar nets, void material, beam pocket plates, and basement window bucks are installed and wrapped with rebar and complies with the foundation plan.
Step flashing- Flashing application method used where a vertical surface meets a sloping roof plane. 6″ X 6″ galvanized metal bent at a 90 degree angle, and installed beneath siding and over the top of shingles. Each piece overlaps the one beneath it the entire length of the sloping roof (step by step).
Stick built- A house built without prefabricated parts. Also called conventional building.
Stile- An upright framing member in a panel door.
Stool- The flat moulding fitted over the window sill between jambs and contacting the bottom rail of the lower sash.  Also another name for toilet.
Stop box- Normally a cast iron pipe with a lid (@ 5″ in diameter) that is placed vertically into the ground, situated near the water tap in the yard, and where a water cut-off valve to the home is located (underground). A long pole with a special end is inserted into the curb stop to turn off/on the water.
Stop Order- A formal, written notification to a contractor to discontinue some or all work on a project for reasons such as safety violations, defective materials or workmanship, or cancellation of the contract.
Stops- Mouldings along the inner edges of a door or window frame. Also valves used to shut off water to a fixture.
Stop valve- A device installed in a water supply line, usually near a fixture, that permits an individual to shut off the water supply to one fixture without interrupting service to the rest of the system.
Storm sash or storm window-. An extra window usually placed outside of an existing one, as additional protection against cold weather.
Storm sewer- A sewer system designed to collect storm water and is separated from the waste water system.
Story- That part of a building between any floor or between the floor and roof.
Strike- The plate on a door frame that engages a latch or dead bolt.
String, stringer- A timber or other support for cross members in floors or ceilings. In stairs, the supporting member for stair treads. Usually a 2 X 12 inch plank notched to receive the treads
Strip flooring- Wood flooring consisting of narrow, matched strips.
Structural floor- A framed lumber floor that is installed as a basement floor instead of concrete. This is done on very expansive soils.
Stub, stubbed- To push through.
Stucco- Refers to an outside plaster finish made with Portland cement as its base.
Stud- A vertical wood framing member, also referred to as a wall stud, attached to the horizontal sole plate below and the top plate above. Normally 2 X 4′s or 2 X 6′s, 8′ long (sometimes 92 5/8″). One of a series of wood or metal vertical structural members placed as supporting elements in walls and partitions.
Stud framing- A building method that distributes structural loads to each of a series of relatively lightweight studs. Contrasts with post-and-beam.
Stud shoe- A metal, structural bracket that reinforces a vertical stud. Used on an outside bearing wall where holes are drilled to accommodate a plumbing waste line.
Subfloor- The framing components of a floor to include the sill plate, floor joists, and deck sheeting over which a finish floor is to be laid.
Sump- Pit or large plastic bucket/barrel inside the home designed to collect ground water from a perimeter drain system.
Sump pump- A submersible pump in a sump pit that pumps any excess ground water to the outside of the home.
Suspended ceiling- A ceiling system supported by hanging it from the overhead structural framing.
Sway brace- Metal straps or wood blocks installed diagonally on the inside of a wall from bottom to top plate, to prevent the wall from twisting, racking, or falling over “domino” fashion.
Switch- A device that completes or disconnects an electrical circuit.

Friday, November 14, 2014

Construction Terms

                  Construction Terms-Q


Quarry tile- A man-made or machine-made clay tile used to finish a floor or wall. Generally 6″ X  6″  X 1/4″ thick .
Quarter round- A small trim moulding that has the cross section of a quarter circle.

                             Construction Terms- R

Rabbet- A rectangular longitudinal groove cut in the corner edge of a board or plank.
Radiant heating- A method of heating, usually consisting of a forced hot water system with pipes placed in the floor, wall, or ceiling. Also electrically heated panels.
Radiation- Energy transmitted from a heat source to the air around it. Radiators actually depend more on convection than radiation.
Radon- A naturally-occurring, heavier than air, radioactive gas common in many parts of the country.  Radon gas exposure is associated with lung cancer. Mitigation measures may involve crawl space and basement venting and various forms of vapour barriers.
Radon system- A ventilation system beneath the floor of a basement and/or structural wood floor and designed to fan exhaust radon gas to the outside of the home
Rafter- Lumber used to support the roof sheeting and roof loads. Generally, 2 X 10′s and 2 X 12′s are used. The rafters of a flat roof are sometimes called roof joists.
Rafter, hip- A rafter that forms the intersection of an external roof angle.
Rafter, valley- A rafter that forms the intersection of an internal roof angle. The valley rafter is normally made of double 2-inch-thick members.
Rail- Cross members of panel doors or of a sash. Also, a wall or open balustrade placed at the edge of a staircase, walkway bridge, or elevated surface to prevent people from falling off.  Any relatively lightweight horizontal element, especially those found in fences (split rail).
Railroad tie- Black, tar and preservative impregnated, 6″ X 8″ and 6′-8′ long wooden timber that was used to hold rail road track in place. Normally used as a member of a retaining wall.
Rake- Slope or slanted.
Rake fascia- The vertical face of the sloping end of a roof eave.
Rake siding- The practice of installing lap siding diagonally
Ranch- A single story, one level home.
Ready mixed concrete- Concrete mixed at a plant or in trucks en route to a job and delivered ready for placement.
Rebar, reinforcing bar-Ribbed steel bars installed in foundation concrete walls, footers, and poured in place concrete structures designed to strengthen concrete. Comes in various thickness’ and strength grade.
Receptacle- An electrical outlet.  A typical household will have many 120 volt receptacles for plugging in lams and appliances and 240 volt receptacles for the range, clothes dryer, air conditioners, etc.
Recording fee – A charge for recording the transfer of a property, paid to a city, county, or other appropriate branch of government.
Redline, red lined prints- Blueprints that reflect changes and that are marked with red pencil.
Reducer- A fitting with different size openings at either end and used to go from a larger to a smaller pipe.
Reflective insulation- Sheet material with one or both faces covered with aluminium foil.
Refrigerant- A substance that remains a gas at low temperatures and pressure and can be used to transfer heat. Freon is an example and is used in air conditioning systems.
Register- A grill placed over a heating duct or cold air return.
Reglaze- To replace a broken window.
Relief valve- A device designed to open if it detects excess temperature or pressure.
Remote- Remote electrical, gas, or water meter digital readouts that are installed near the front of the home in order for utility companies to easily read the home owners usage of the service.
Retaining wall- A structure that holds back a slope and prevents erosion.
Retentions- Amounts withheld from progress billings until final and satisfactory project completion.
R factor or value- A measure of a materials resistance to the passage of heat. New home walls are usually insulated with 4″ of batt insulation with an R value of R-13, and a ceiling insulation of R-30.
Ribbon (girt)- Normally a 1 X 4 board let into the studs horizontally to support the ceiling or second-floor joists.
Ridge- The horizontal line at the junction of the top edges of two sloping roof surfaces.
Ridge board- The board placed on the ridge of the roof onto which the upper ends of other rafters are fastened.
Ridge shingles- Shingles used to cover the ridge board.
Rim joist- A joist that runs around the perimeter of the floor joists and home.
Rise- The vertical distance from the eaves line to the ridge. Also the vertical distance from stair tread to stair tread (and not to exceed 7 ½”).
Riser- Each of the vertical boards closing the spaces between the treads of stairways.
Riser and panel- The exterior vertical pipe (riser) and metal electric box (panel) the electrician provides and installs at the “Rough Electric” stage.
Road base- A aggregate mixture of sand and stone.
Rock 1, 2, 3- When referring to drywall, this means to install drywall to the walls and ceilings (with nails and screws), and before taping is performed.
Roll, rolling- To install the floor joists or trusses in their correct place. (To “roll the floor” means to install the floor joists).
Romex- A name brand of non metallic sheathed electrical cable that is used for indoor wiring.
Roll roofing- Asphalt roofing products manufactured in roll form. 36-inch wide rolls with and 108 square feet of material. Weights are generally 45 to 90 pounds per roll.
Romex- A name brand of non metallic sheathed electrical cable that is used for indoor wiring.
Roof jack- Sleeves that fit around the black plumbing waste vent pipes at, and are nailed to, the roof sheeting.
Roof joist- The rafters of a flat roof. Lumber used to support the roof sheeting and roof loads. Generally, 2 X 10′s and 2 X 12′s are used.
Roof sheathing or sheeting- The wood panels or sheet material fastened to the roof rafters or trusses on which the shingle or other roof covering is laid.
Roof valley- The “V” created where two sloping roofs meet.
Rough opening- The horizontal and vertical measurement of a window or door opening before drywall or siding is installed.
Rough sill- The framing member at the bottom of a rough opening for a window. It is attached to the cripple studs below the rough opening.
Roughing-in- The initial stage of a plumbing, electrical, heating, carpentry, and/or other project, when all components that won’t be seen after the second finishing phase are assembled. See also Heat Rough, Plumbing Rough, and Electrical Rough.
Run, roof – The horizontal distance from the eaves to a point directly under the ridge. One half the span.
Run, stair- the horizontal distance of a stair tread from the nose to the riser.
R Value- A measure of insulation. A measure of a materials resistance to the passage of heat. The higher the R value, the more insulating “power” it has. For example, typical new home’s walls are usually insulated with 4″ of batt insulation with an R value of R-13, and a ceiling insulation of R-30.